Company Name: creekside cabinetswe just installed these last week. looking back on the job i don't see how we did it. when i bid the job i had 7 guys working for me. i thought no problum, build as much as we can in the shop and then take all the guys up to this megamansion for a week for the install. well this is the dining room for a 14000 sq. ft. house and it took about 8 months befor the job started. when the job finally started i was as busy as i have ever been and was down to 4 guys, for various reasons. that means the job fell to mike and i. so two guys built and installed this in about 5 weeks. this room is 18x37 with 22 foot metal stud walls. guess i owe mike a bonus.
Social Media: | Tweet |
Posted By: | Molloy Studios |
2 guys, Hoo Ra, yup I think you owe Mike a bonus.. By the way, very nice job.. Wish I had Mike...
Bill
Posted By: | John C. Randolph |
Bravo! That is some beautiful work.
Do you have a finished shot, with the scaffolding removed?
-jcr
Posted By: | andy |
hey i don't have the finished shot yet as they are staining the trusses. i will be returning to the job as we are trimming the front door that we built. two walnut doors 3x9 with a full radius arched transom. the trim package on the interior portion of the front door is $8700.00. crazy isn't it. i will post those pictures as we put the thing together. andy
Posted By: | W |
Andy,
Wow. Nicely done. Must make you smile to realize that those beautiful trusses will be just as spectacular a generation from now when we're all long since gone. Hats off to you both, and Mikey deserves a very nice bonus indeed.
All the best.
--- Wayne
Posted By: | Dana M. |